Case Studies

Replacing Progressive Cavity Pumps

A large scale municipal waste water treatment facility in Western NY State had an installed base of progressive cavity pumps for delivery sludge to the filter press. These pumps required constant maintenance and replacement parts and on an annual basis rivaled the cost of a new pump.

View the CPE Solution

Concrete Repair & High Performance Lining

A process drainage ditch had severely deteriorated concrete and corroded steel frame. Previous concrete patches were not effective in the acidic environment.

View the CPE Solution

Odor Control Systems

CPE can design and install a fiberglass system to contain gases and odors associated with open top tanks and clarifiers in Waste and Waste Water treatment facilities.

View the CPE Solution

CC-100 Ceramic Coating – Corrosion Resistant Radiant Heat Barrier

CC-100 was utilized to reduce the ambient temperature of a vault occupied by active steam piping from 160°F to a safe working working environment at 120°F.

View the CPE Solution

A.W. Chesterton Split Seal and Flush Reducing SpiraTrac Bushing

By converting from packing to a split mechanical seal and SpriralTrac bushing, a large municipal wast treatment facility is realizing an 85% reduction in water consumption.

View the CPE Solution

 

News

Chem Show 2011

10.17.11

Visit Blackmer and American-Marsh Pump Companies at this year's CHEM SHOW at the Javits Convention Center NY, NY - Novemeber 1-3

Showcasing the latest process equipment, products and tech... [read more]

September 1, 2010 - Following the sale of CPE’s Plastic Pipe Division to Ryan Herco Flow Solutions, CPE has re-established our brand as the premium supplier of rotating equipment, specialty pipi... [read more]

Our Services